{"id":5798,"date":"2026-10-23T11:36:25","date_gmt":"2026-10-23T11:36:25","guid":{"rendered":"https:\/\/www.teslacad.com.au\/blog\/?p=5798"},"modified":"2026-10-23T11:52:09","modified_gmt":"2026-10-23T11:52:09","slug":"energy-efficient-buildings-coordinating-the-envelope-mep-systems-and-performance-in-bim","status":"publish","type":"post","link":"https:\/\/www.teslacad.com.au\/blog\/energy-efficient-buildings-coordinating-the-envelope-mep-systems-and-performance-in-bim\/","title":{"rendered":"Energy-Efficient Buildings: Coordinating the Envelope, MEP Systems, and Performance in BIM"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">An energy-efficient building depends on decisions made throughout the design process, not just the equipment selected at the end. Early choices, such as the building\u2019s orientation, window design, insulation, and shading, can affect its energy use. These decisions also need to be considered alongside the building services and their heating and cooling requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This makes BIM useful beyond simply producing project documentation. The model can bring the building envelope, structural elements, and MEP systems together so that teams can check how they work with each other. It also gives them a chance to find design issues earlier, before they lead to changes during construction.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For Australian AEC projects, this is becoming increasingly relevant as energy-efficiency requirements, performance assessments, and operational benchmarks continue to influence building design.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"557\" src=\"https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/bim-mep-coordination-model-3d-building-1024x557.webp\" alt=\"A 3D BIM coordination model showing mechanical, electrical and plumbing services integrated across the building's floors, a typical deliverable for clash detection and design coordination.\" class=\"wp-image-5801\" title=\"3D BIM MEP coordination model\" srcset=\"https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/bim-mep-coordination-model-3d-building-1024x557.webp 1024w, https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/bim-mep-coordination-model-3d-building-300x163.webp 300w, https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/bim-mep-coordination-model-3d-building-767x417.webp 767w, https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/bim-mep-coordination-model-3d-building-1536x835.webp 1536w, https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/bim-mep-coordination-model-3d-building.webp 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><strong>3D BIM model of a multi-storey building showing coordinated MEP pipework, ducts and services<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>The Growing Importance of BIM for Building Envelope Design<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Building envelopes are becoming more technically complex. Features such as better-performing glazing, insulated facade systems, external shading, and airtight construction now need to be considered together to achieve the required thermal performance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At the same time, the envelope needs to be considered alongside the structural and MEP design. For example, A fa\u00e7ade support bracket can create a break in the insulation layer, while the junction between the floor slab and the external wall can form a path for heat transfer. Window placement can change the amount of solar heat entering the building, which can also affect the heating and cooling load on the HVAC system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">BIM allows teams to review how these elements fit together before construction begins. Instead of handling the fa\u00e7ade separately, the team can work on its geometry, materials, connections, and related building services in the same model.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is one reason <a href=\"https:\/\/www.teslacad.com.au\/mep-bim-co-ordination-services.php\" title=\"BIM Coordination Services | MEP Coordination Services\">BIM coordination services<\/a> are becoming increasingly valuable for projects targeting higher levels of energy performance.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Building Envelope Coordination: Turning Performance Requirements into Model Information<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The building envelope includes walls, roofs, floors, windows, doors, glazing, insulation, and shading elements. Each component contributes to the building\u2019s thermal performance, but the interfaces between them can matter just as much<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A coordinated BIM model can help teams maintain consistent information about envelope assemblies while identifying conflicts between fa\u00e7ade, structural, and MEP elements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For example, a service penetration through an insulated wall needs to be coordinated without compromising the intended assembly. Similarly, fa\u00e7ade supports, slab edges, and window interfaces need to be detailed with thermal performance in mind.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Detailed BIM modelling can help project teams coordinate these elements while maintaining accurate geometry and construction information.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Passive Performance in BIM: Orientation, Shading and Glazing<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Energy efficiency starts with reducing demand.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Building orientation, window placement, glazing performance, external shading, and building form influence solar heat gain and the amount of heating or cooling required. These decisions are particularly important because changing them late in the design process can affect multiple disciplines.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">BIM allows architects and consultants to coordinate:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Building orientation and form.<\/li>\n\n\n\n<li>Window-to-wall relationships.<\/li>\n\n\n\n<li>Glazing types and locations.<\/li>\n\n\n\n<li>External shading devices.<\/li>\n\n\n\n<li>Roof and wall assemblies.<\/li>\n\n\n\n<li>Internal zones and spaces.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The model can therefore become a useful foundation for performance analysis rather than simply a 3D representation of the building.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Thermal Bridging: Coordinating the Weak Points in the Envelope<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Thermal performance can be compromised at junctions even when the main wall or roof assembly performs well.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"572\" src=\"https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/facade-slab-edge-thermal-break-mep-penetration-1024x572.webp\" alt=\"Illustrative detail of a building fa\u00e7ade at the slab edge, showing continuous insulation, a thermal-break bracket and a sealed MEP penetration. Coordinating these junctions early in design helps reduce thermal bridging and air leakage.\" class=\"wp-image-5802\" title=\"Fa\u00e7ade and slab edge thermal detail\" srcset=\"https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/facade-slab-edge-thermal-break-mep-penetration-1024x572.webp 1024w, https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/facade-slab-edge-thermal-break-mep-penetration-300x167.webp 300w, https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/facade-slab-edge-thermal-break-mep-penetration-767x428.webp 767w, https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/facade-slab-edge-thermal-break-mep-penetration-1536x857.webp 1536w, https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/facade-slab-edge-thermal-break-mep-penetration-2048x1143.webp 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><strong>Building fa\u00e7ade cutaway showing insulation, thermal break bracket and sealed pipe penetration at a slab edge<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Thermal bridging can develop where different sections of the building envelope join together. A small break in the insulation at these locations can allow more heat to pass through and may lead to condensation. That is why designers need to check these junctions carefully.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">BIM helps teams examine these conditions at a level of detail that is difficult to maintain through disconnected drawings.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For example, an architectural model can be coordinated with the structural model to review slab-to-fa\u00e7ade interfaces, while MEP coordination can identify penetrations that could affect envelope continuity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This makes BIM coordination particularly useful when disciplines must maintain detailed envelope performance.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Energy-Efficient MEP Coordination: Designing Services Around Building Loads<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">An efficient HVAC system cannot compensate indefinitely for an inefficient building envelope.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Australian Government guidance notes that HVAC systems can account for up to 50% of commercial building energy use and can dominate peak electricity demand. It also highlights reducing demand through insulation, high-performance glazing, natural ventilation and external shading as part of a holistic HVAC strategy.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This makes coordination between envelope design and MEP systems essential.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A BIM workflow can coordinate HVAC zones, ductwork, pipework, equipment, plant rooms, electrical services and access requirements while reducing clashes between disciplines.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.teslacad.com.au\/mep-bim-services.php\" title=\"MEP BIM Services | MEP BIM Modelling Services in Australia\">MEP BIM services<\/a> can therefore support both constructability and energy-conscious design.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Connecting BIM Data to Energy Assessment Workflows<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A BIM model becomes more valuable when its information can support downstream performance assessment.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"667\" src=\"https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/connecting-bim-data-energy-assessment-workflow-1024x667.webp\" alt=\"The workflow connects the physical BIM model and location data to Autodesk energy simulation, then to comfort assessment against ISO 7730, ASHRAE 55 and EN 15251.\" class=\"wp-image-5804\" title=\"BIM to energy assessment workflow\" srcset=\"https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/connecting-bim-data-energy-assessment-workflow-1024x667.webp 1024w, https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/connecting-bim-data-energy-assessment-workflow-768x500.webp 768w, https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/connecting-bim-data-energy-assessment-workflow-300x195.webp 300w, https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/connecting-bim-data-energy-assessment-workflow-1536x1000.webp 1536w, https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/connecting-bim-data-energy-assessment-workflow.webp 1554w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><strong>Workflow diagram linking a Revit BIM model and climate data to Autodesk energy simulation and comfort assessment<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Energy workflows may require data about floor areas, orientation, glazing, insulation, construction assemblies, occupancy, HVAC systems, and equipment. If these inputs differ between the BIM model and the assessment workflow, teams may need to recreate or manually reconcile the information.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For residential projects, NatHERS assessments consider factors including climate, orientation, insulation, windows, shading, building materials, and air leakage. The current Home Energy Rating certificate includes both a star rating and a whole-of-home rating. In most jurisdictions, the current minimums are 7 stars and 60\/100, respectively.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For commercial buildings, Section J and performance-based compliance methods may require modelling and documentation of the building fabric and services in greater detail. BIM can help organise the information needed for these workflows, provided the model is structured around the intended assessment requirements.<\/p>\n\n\n\n<div class=\"canonic-light\">\n<p><strong>Around 90% of new Australian homes are assessed using NatHERS to demonstrate that they meet the National Construction Code\u2019s minimum energy-efficiency requirements. The Star Rating measures the thermal performance of the home\u2019s design and construction, while the Whole of Home rating considers broader energy use, including major fixed appliances, onsite renewable energy generation, and battery storage.-<a href=\"https:\/\/www.homeenergyrating.gov.au\/households\/new-homes\/measuring-energy-efficiency-new-homes\" title=\"Measuring the energy efficiency of new homes\" target=\"_blank\">SOURCE<\/a><\/strong><\/p>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Section J and NatHERS Documentation Support<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Energy assessment does not end with modelling. The information must also be communicated through drawings, schedules, specifications and supporting documentation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For BIM teams, this means maintaining consistency between model elements and the information presented in the documentation set.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For example, changes to glazing, insulation, wall construction, or shading should be reflected wherever that information is referenced. A coordinated workflow can reduce discrepancies between design models, drawings and assessment inputs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">NCC 2025 also increases the importance of coordinated energy information for commercial projects. Its commercial energy-efficiency provisions include measures for onsite solar PV, building envelopes, services, and lighting controls. Individual states and territories determine adoption of NCC 2025, so project teams should confirm which provisions apply to their project and jurisdiction.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Technical Skills Required for BIM in Building Envelope Design<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Designing building envelopes through BIM requires more than accurate modelling. Professionals need a combination of BIM expertise, building-science knowledge, and coordination skills to support energy performance and constructability.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Advanced BIM Software Knowledge<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Proficiency in tools such as Revit is essential to accurately model walls, roofs, curtain walls, glazing, insulation, and fa\u00e7ade systems.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Understanding of Building Physics &amp; Envelope Materials<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Understanding thermal properties, insulation, glazing, moisture, and material behaviour helps create envelope models that support performance-focused design.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Climatic &amp; Environmental Expertise<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Knowledge of solar exposure, temperature, rainfall, wind, and humidity helps BIM professionals coordinate envelope systems for local climate conditions.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Coordination &amp; Integration Skills<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Envelope design involves architecture, structure, fa\u00e7ade systems, and MEP. Strong BIM coordination services help identify and resolve conflicts between these disciplines.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Thermal Performance &amp; Energy Modelling Knowledge<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Knowledge of U-values, R-values, solar heat gain, thermal bridging, and shading connects envelope design decisions to energy performance.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Detailed Modelling &amp; Documentation Skills<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Accurate modelling of fa\u00e7ade junctions, window interfaces, slab edges, insulation, and penetrations helps keep BIM models consistent with construction documentation.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Multidisciplinary Problem-Solving<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">BIM professionals need to understand how changes to glazing, structure, or MEP systems can affect overall envelope performance and coordinate solutions across disciplines.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Knowledge of Energy Codes &amp; Performance Requirements<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">For Australian projects, BIM teams need to know requirements such as the NCC, NatHERS, and Section J. This knowledge helps them set up the model and related documentation to meet the project\u2019s energy-performance requirements.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Why Invest in BIM Expertise for Building Envelope Design?<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For owners, architects, and contractors, BIM expertise offers more than a detailed 3D model.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Specialist BIM expertise can help identify coordination issues earlier, reduce rework, improve documentation quality, and provide better control over complex envelope interfaces.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It can also help project teams connect architectural decisions with structural and MEP requirements before construction begins.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is especially valuable for projects with complex fa\u00e7ades, performance requirements, multiple consultants, or detailed energy assessments. Instead of discovering conflicts after design decisions are embedded in documentation, teams can review relationships within a coordinated digital environment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For firms without dedicated in-house BIM capability, working with a specialist BIM modelling services provider can provide access to technical modelling and coordination expertise without expanding the internal team for every project.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Energy Planning: Coordinating Plant, Service Spaces and Future Requirements<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Energy-efficient design also requires sufficient space for the systems that make performance possible.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"572\" src=\"https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/coordinated-bim-mep-plant-room-hvac-risers.jfif_.webp\" alt=\"Plant room layout showing space for HVAC equipment, electrical switchboards and coordinated risers, with clear maintenance access for the building's services.\" class=\"wp-image-5805\" title=\"Coordinated BIM MEP plant room\" srcset=\"https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/coordinated-bim-mep-plant-room-hvac-risers.jfif_.webp 1024w, https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/coordinated-bim-mep-plant-room-hvac-risers.jfif_-300x168.webp 300w, https:\/\/www.teslacad.com.au\/blog\/wp-content\/uploads\/2026\/10\/coordinated-bim-mep-plant-room-hvac-risers.jfif_-768x429.webp 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\"><\/figure>\n\n\n\n<p class=\"has-text-align-center wp-block-paragraph\"><strong>Rooftop plant room with HVAC units, colour-coded pipework and electrical switchboards.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Plant rooms, risers, electrical rooms, HVAC equipment, renewable-energy infrastructure and maintenance zones need to be considered early. Poor planning can squeeze equipment into unsuitable spaces or cause services to conflict with structural and architectural elements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">BIM lets teams coordinate these requirements spatially and test whether equipment, access routes, and service clearances can actually work before construction.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This becomes increasingly important as projects consider electrification, onsite renewable energy and more sophisticated building-management systems.<\/p>\n\n\n\n<div class=\"canonic-light\">\n<p><strong>As of 2026, 83% of Australia\u2019s office space held a NABERS Energy rating. NABERS Energy measures operational energy performance by comparing actual building energy consumption against benchmarks developed from real-world data. The latest Energy Performance Indicator Rules are Version 1.4, published on April 29, 2026. \u2013<a href=\"https:\/\/www.nabers.gov.au\/ratings\/spaces-we-rate\/office-buildings\" title=\"Office Buildings | NABERS\" target=\"_blank\">SOURCE<\/a><\/strong><\/p>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>From Coordinated BIM to Better Building Performance<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Energy efficiency is ultimately a coordination problem.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The envelope affects HVAC loads. Glazing affects solar gain. Structural junctions can create thermal bridges. MEP systems respond to building loads. Energy assessments depend on reliable design information. Operational ratings depend on how the completed building actually performs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">BIM creates a common environment where teams can coordinate these relationships. With the right combination of <a href=\"https:\/\/www.teslacad.com.au\/bim-services.php\" title=\"Cutting-Edge BIM Services for Optimal Construction Solutions\">BIM modelling<\/a> and energy-performance knowledge, project teams can move beyond simply documenting a building toward understanding and coordinating how it will perform.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The goal is not to make BIM another step in the design process. It is to use BIM to make the design process itself more coordinated, measurable, and performance-focused.<\/p>\n\n\n\n<div class=\"canonic-dark mt-5\">\n<span class=\"wp-block-heading text-aqua fw-bold\">Ready to Improve Your Building\u2019s Energy Performance?<\/span>\n<p class=\"pt-3\"><strong>Share your requirements with us and get a tailored BIM coordination approach for your envelope, MEP systems, and performance goals.<\/strong><\/p>\n<p><a class=\"btn btn-aqua text-capitalize text-black\" href=\"https:\/\/www.teslacad.com.au\/contact-us.php\" title=\"Contact your BIM Partner | Free Quote | BIM Services\">Contact Us Today<\/a><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>An energy-efficient building depends on decisions made throughout the design process, not just the equipment selected at the end. Early choices, such as the building\u2019s orientation, window design, insulation, and shading, can affect its energy use. These decisions also need to be considered alongside the building services and their heating and cooling requirements. This makes [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5800,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"featured_image_2":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-5798","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.teslacad.com.au\/blog\/wp-json\/wp\/v2\/posts\/5798","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.teslacad.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.teslacad.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.teslacad.com.au\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.teslacad.com.au\/blog\/wp-json\/wp\/v2\/comments?post=5798"}],"version-history":[{"count":7,"href":"https:\/\/www.teslacad.com.au\/blog\/wp-json\/wp\/v2\/posts\/5798\/revisions"}],"predecessor-version":[{"id":5811,"href":"https:\/\/www.teslacad.com.au\/blog\/wp-json\/wp\/v2\/posts\/5798\/revisions\/5811"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.teslacad.com.au\/blog\/wp-json\/wp\/v2\/media\/5800"}],"wp:attachment":[{"href":"https:\/\/www.teslacad.com.au\/blog\/wp-json\/wp\/v2\/media?parent=5798"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.teslacad.com.au\/blog\/wp-json\/wp\/v2\/categories?post=5798"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.teslacad.com.au\/blog\/wp-json\/wp\/v2\/tags?post=5798"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}