Structural Industrical Batch Plant

Input


Output

Name of Building: Structural Industrical Batch Plant
Country: USA
Type of Building: Tower And Trusses
Numbers of floor: In Tower Six floor + Roof
Total Tonnage: 850 Ton
Nature of the project : This was a steel detailing project.
Software used : Project executed in Tekla Software.
Hours Consumed : 3315 Hours
Turn Around time : 95 Working Days


Project Description : This project included working on Structural Fabrication Drawings for the following segments of the building

  • MIXING TOWER
  • EAST GANTRY
  • NORTH GANTRY
  • MAIN GANTRY
  • 4 FURNACES
  • 13 SILO
  • CULLET RETURN
  • SILO 11 MODIFICATION
  • NORTH STAIR TOWER

We had to develop the Anchor Bolt Plan, Erection Plans, Assembly Drawings, Part Drawings, Reports (Assembly List, Part List, Bolt List, etc.) and submit the .NC files to the client.